Skip to content
Amptech Pty Ltd — calibration services Perth
Workplace test & tag · Northern suburbs

Test & Tag in Landsdale

On-site inspection, testing and tagging to AS/NZS 3760 for Landsdale workplaces — industrial estate & trades — with a full compliance register and reminders before the next round is due.

Landsdale's industrial area along Hepburn Avenue and Mirrabooka Avenue houses transport depots, landscaping and construction suppliers, and workshops serving the northern growth corridor. Many businesses here run crews on construction sites, so their test & tag registers mix workshop tools with the gear that leaves the depot every morning.

Who we test & tag in Landsdale

  • Transport and equipment depots
  • Construction and landscaping suppliers
  • Mechanical workshops
  • Trade contractor bases

AS/NZS 3760 intervals for Landsdale workplaces

The re-test frequencies that apply to the environments we most often see in Landsdale. We confirm the classification for each area on the first visit.

EnvironmentInterval
Factories, workshops & warehouses6 months
Building & construction sites3 months
Hire equipment (inspection / test)3 / 12 months

What we test & tag

  • Portable power tools
  • Office & kitchen appliances
  • Extension leads & power boards
  • Battery chargers & adaptors
  • Site & workshop equipment
  • RCDs (safety switches)
  • New equipment (out-of-box)
  • Hire & loan equipment

Calibration pickup & drop-off in Landsdale

Test & tag happens at your premises. Calibration does not — it is bench work performed in our Caversham lab against references traceable to national standards. While our technician is in Landsdale for the round, we collect any instruments that are due and return them with their certificates, so you deal with one supplier and one invoice.

See every instrument we calibrate

Getting to Landsdale

Off Hepburn Avenue and Alexander Drive, close to the Reid Highway and the Mirrabooka Avenue industrial strip.

FAQ

Test & tag in Landsdale FAQs

Our tools go out to construction sites — what interval applies?
Equipment used on construction and demolition sites is tested every 3 months under AS/NZS 3760, even if it lives at your Landsdale depot between jobs. We can run the round at the depot so nothing leaves without a current tag.
Do you test hire equipment?
Yes. Hire equipment is inspected before each hire and tested at the AS/NZS 3760 interval; we can set up the register to track both.
Is test and tag a legal requirement?
Under WHS law every employer has a duty to keep electrical equipment safe. AS/NZS 3760 is a standard rather than a law in itself, but it is the recognised way to meet that duty — and on construction and demolition sites, WHS regulations make testing and tagging of portable equipment a requirement.
What is included in a test and tag?
A visual inspection, an electrical safety test with a calibrated appliance tester, a durable tag showing the test and due dates, and an itemised register of results for your records.

Book test & tag in Landsdale

Tell us the site and roughly how many items, and we will quote the round and any calibration pickups in writing.